In order to realise the membrane roof extension of the Mercedes Benz Arena, the Membrantean installed the entire new rope support system including 40 pneumatic cushions, 64 membrane arches and 40 roof sections. The inner rope ring, weighing 30 t, with radial axes, was lifted and bolted-in by hand during a 12-hour-long lifting action. The rope construction, including the steel supports and arches, weighs 70 t and includes more than 1500 metres of rope. The covered area of the inner ring is 6,5 metres wide on the grandstands and 15 m on the curves. The Membranteam also installed four modern light platforms and two LED video panels. Existing membranes had already been replaced, as commissioned by the company Taiyo Europe GmbH.