Allianz Arena

Year: 2005
Size: 66000
Location: Munich/Germany
Client: Covertex
Order type: Pneumatic foil cushions

SHORT DESCRIPTION


The technology for the work platform nets developed by Membranteam was successfully and reliably implemented at the Allianz Arena building site. With the help of up to 125 assembly fitters, led by the Membranteam, 2816 rhombic pneumatic membrane cushions made of ETFE foil, as well as the entire air supply technology, was installed on the stadium envelope.
This 66 000 m² membrane envelope is the largest in the world. The installation of the sliding suspended ceiling, as well as the fine-tuning of the individual sections, was successfully managed by the Membranteam employees.

Olympic Stadium London

Year: 2010
Size: 25.760
Location: London/England
Client: Seele Austria
Order type: Work platform net

SHORT DESCRIPTION


In order to spread the load equally across the rope sup­port struc­ture, ini­tially all the con­struc­tion ma­ter­ial was de­pos­ited in stor­age nets in the inner ring of the roof struc­ture. Fol­low­ing this, the 112 pan­els were in­stalled one after the other on five work plat­forms, which were con­stantly moved in the dir­ec­tion of the as­sembly. The 3,3 km joints were then closed using hot air weld­ing.

Mercedes-Benz-Arena

Year: 2011
Size: 8.000
Location: Stuttgart/Deutschland
Client: Eiffel Deutschland Stahltechnologie, Stadion NeckarPark GmbH & Co. KG
Order type: Membranes

SHORT DESCRIPTION


In order to real­ise the mem­brane roof ex­ten­sion of the Mer­cedes Benz Arena, the Mem­brantean in­stalled the en­tire new rope sup­port sys­tem in­clud­ing 40 pneu­matic cush­ions, 64 mem­brane arches and 40 roof sec­tions. The inner rope ring, weigh­ing 30 t, with ra­dial axes, was lif­ted and bolted-in by hand dur­ing a 12-hour-long lift­ing ac­tion. The rope con­struc­tion, in­clud­ing the steel sup­ports and arches, weighs 70 t and in­cludes more than 1500 metres of rope. The covered area of the inner ring is 6,5 metres wide on the grand­stands and 15 m on the curves. The Mem­branteam also in­stalled four mod­ern light plat­forms and two LED video pan­els. Ex­ist­ing mem­branes had already been re­placed, as com­mis­sioned by the com­pany Taiyo Europe GmbH.

Arena Nationala Bukarest

Year: 2011
Size: 10.000 und 4.300
Location: Bukarest/Rumänien
Client: Graboplan GmbH
Order type: Membranes

SHORT DESCRIPTION


For this con­tract, our scope of ser­vices in­cluded the in­stall­a­tion of the inner mem­brane, the in­stall­a­tion of work plat­form nets for other trades, as well as the in­stall­a­tion of the steel arches!

Baku Crystal Hall

Year: 2012
Size: 20.000
Location: Baku/Azerbaijan
Client: Seele Austria
Order type: Membranes

SHORT DESCRIPTION


At temperatures from -10°C to +30°C on construction site have worked up to 55 man from Mem­branteam. Des­pite the ex­treme weather con­di­tions on the pen­in­sula and the winds from the Caspian Sea, as well as the dead­line pres­sure due to the up­com­ing ESC 2012, the Mem­branteam was able to suc­cess­fully com­plete the pro­ject task in ad­vance of the planned dead­line. Fol­low­ing test in­stall­a­tions in Ank­ara, the Mem­branteam ini­tially began in wintry Baku with a team of 20 and then con­tinu­ously in­creased this num­ber to a total of 3 teams. Two clos­ure flaps were heat-sealed around the hall and bon­ded with alu­minium com­pos­ite sheets. 2 cranes and 12 risers were used to in­stall the mem­brane. We were also in­volved in the elec­trical in­stall­a­tion, the roof drain­age, dry walling, fire pre­ven­tion, the in­stall­a­tion of the panel façade and the steel con­struc­tion!

Bay Arena

Year: 2009
Size: 40.000
Location: Leverkusen/Germany
Client: Max Bögl
Order type: Spezialmontagen

SHORT DESCRIPTION


As spe­cial­ists for in­stall­a­tion in loc­a­tions that are dif­fi­cult to ac­cess, we in­stalled the 236 roof sec­tions of the Bay Arena in just eight weeks. 
The steel sup­port­ing struc­ture was pre-as­sembled on the ground by our spe­cial­ist staff and then covered with Mak­rolon, in col­lab­or­a­tion with our cli­ent. Fol­low­ing this, the sec­tions were in­stalled into the rope con­struc­tion in the roof by our pro­fes­sional in­dus­trial climbers. In ad­di­tion to this main as­sembly work, we were also re­spons­ible for the in­stall­a­tion of the drain­age chan­nels as well as the gut­ter heat­ing.