As we have a pool of assembly specialists with different skills, the FIFA 2006 was a welcome challenge for us. For two years, the DFB football globe was assembled and disassembled by the Membranteam in a total of 8 cities. In addition to the installation of 29 three-layered pneumatic foil cushions and the two-part steel ridge field, the scope of activity included the installation of the air conduction, the sealing of the construction, and the installation of the gutter heating.